Case Studies

Helping Scottish Water Horizons beat grid constraints and get closer to net zero
Scottish Water Horizons | BESS to beat grid constraints

Helping Scottish Water Horizons beat grid constraints and get closer to net zero

Find out how Scottish Water Horizons overcame grid constraints and accelerated its net zero journey with our DC-coupled BESS solution.
Scottish Water Horizons | BESS to beat grid constraints

How We Helped a Scottish Water Utility Maximise Peak Shaving Whilst Bypassing Grid Constraints

How We Helped a Scottish Water Utility Maximise Peak Shaving Whilst Bypassing Grid Constraints
Boosting Sustainability & Energy Resilience for Exeter City Council
Exeter City Council logo on the blue background

Boosting Sustainability & Energy Resilience for Exeter City Council

Exeter City Council was looking to boost sustainability and energy resilience. Wattstor strengthened their use of solar generation assets...
Overcoming Grid Constraints with Northumberland County Council
Northumberland County Council logo on the blue background

Overcoming Grid Constraints with Northumberland County Council

Wattstor helps Northumberland County Council overcome grid constraints by installing an integrated DC battery energy storage solution (BESS)...
From Intense User to Net Zero Trader: Supporting HENNLICH’s Energy Transformation
HENNLICH logo on the blue background

From Intense User to Net Zero Trader: Supporting HENNLICH’s Energy Transformation

In line with its sustainability goals, the renewables division, was looking to implement a solar PV and battery system on its own premises...
Helping ENERGE Stabilise the Slovakian Grid on the Path to Decarbonisation
Energe logo on blue background

Helping ENERGE Stabilise the Slovakian Grid on the Path to Decarbonisation

We successfully designed and implemented a battery storage system commissioned specifically to be integrated into the FCR ancillary services.
Supporting Sunderland City Council on the Path to Carbon Neutrality
Sunderland City Council logo on blue background

Supporting Sunderland City Council on the Path to Carbon Neutrality

As part of the city’s path to carbon neutrality, the council wanted to implement a renewable energy system at its new Parsons Vehicle...
EV Charging Site Uses Wattstor EMS to Avoid Demand Peak
Wattstor battery energy storage system installed at the Hrvatska Elektroprievreda project in Croatia, road in the background.

EV Charging Site Uses Wattstor EMS to Avoid Demand Peak

EV Charging project using Wattstor EMS to avoid the need to increase their grid capacity
Achieving net zero through solar optimization – Mawdsleys
Mawdsleys logo on blue background

Achieving net zero through solar optimization – Mawdsleys

Maximizing on-site solar potential for the UK's largest independent pharmaceutical distributor
Multi-Site EV Charging Rollout Support – National Highways
National Highways logo on blue background

Multi-Site EV Charging Rollout Support – National Highways

Overcoming grid constraints to deliver EV charging across 200 sites in the UK