Project snapshot
| Customer | BioEner Slovakia, a.s. |
|---|---|
| Sector | Commercial & Industrial |
| Location | Štúrovo, Slovakia |
| Onsite system | Wattstor battery energy storage system (BESS), Podium energy management system (EMS) |
| Battery storage | 6.4 MW / 13.36 MWh |
| Delivery time | 6 months |
A demanding brief, a tight deadline
When BioEner Slovakia, a renewable energy research and development specialist, needed a large-scale battery system built at an industrial park site, the brief came with almost no room for delay. The system had to be ready to support the wider project’s technical and commercial flexibility from day one.
After a thorough selection process, BioEner Slovakia chose Wattstor to deliver it, looking for a partner with a proven European track record and the technical depth to hit a demanding schedule without cutting corners.
Delivering scale without cutting corners
Speed was the deciding factor, but it could not come at the expense of quality or reliability. BioEner Slovakia weighed up several potential suppliers before choosing Wattstor, following a thorough selection process. The company wanted a partner with a proven European track record and the technical backing to deliver confidently on a demanding schedule.
Designed and delivered for speed, without compromise
We designed and delivered a 6.4 MW / 13.36 MWh battery energy storage system (BESS), one of the largest of its kind in Slovakia, built to be ready for immediate connection and operation.
To meet the timeline, we specified a battery container with the power conversion system built in, cutting the onsite construction and electrical work needed and shortening the gap between design and commissioning. Alongside the technical build, our team managed the permitting process directly, coordinating technical documentation and liaising with the relevant authorities to keep the project on schedule through to handover.
Delivery:
- Solution design for a large-scale battery storage system
- Delivery of a 6.4 MW / 13.36 MWh BESS with an integrated power conversion system
- Integration of the Podium EMS for automated monitoring and control
- Technical optimisation to support rapid commissioning
- End-to-end support through the permitting process
Automated oversight, built in from day one
We also integrated our Podium energy management system (EMS), which gives BioEner Slovakia continuous, automated oversight of the battery’s performance. It monitors the system in real time, flags issues early, and supports planned maintenance, so the asset runs reliably with minimal manual oversight. Podium’s existing compatibility with third-party energy service providers also made it straightforward for BioEner Slovakia to fit the system into its own operations.
Six months, start to finish
The full system, from initial design through to commissioning, was delivered in six months.
Outcome:
- One of the largest battery storage systems delivered in Slovakia
- 6.4 MW / 13.36 MWh BESS commissioned in 6 months, owned and operated by BioEner Slovakia
- Simplified installation through an integrated power conversion system
- Smooth integration with the customer’s existing service arrangements
- Proactive support through a complex permitting process
Ready to find out what Wattstor can deliver for your site?
If you’re weighing up a battery storage project and want a partner who can move fast without compromising on quality, get in touch with our team today.
Up next...
Transforming Energy Risk into Predictable Savings for Utilities
Contact us
If your commercial energy bills are too high but you have plenty of roof space, we could help you cut costs and carbon. Tell us more below
Contact us
If your commercial energy bills are too high but you have plenty of roof space, we could help you cut costs and carbon. Tell us more below
- +44 (0) 20 3868 5555
- [email protected]
- Wattstor Ltd, 21 Ironmonger Lane, London EC2V 8EY