KOOR is a Slovak energy services provider with a strong track record in the country’s energy sector. This project, based in an industrial area of Poprad, is the third large-scale battery storage installation KOOR has delivered together with Wattstor since the two companies began working together in 2023.
Project snapshot
| Customer | KOOR OZE, s.r.o. |
|---|---|
| Sector | Energy services and project development |
| Location | Poprad, Slovakia |
| Onsite system | Battery energy storage system (BESS), Podium energy management system (EMS) |
| Battery storage | 2.16 MW / 5.02 MWh |
| Delivery time | 12 months |
A partnership that keeps building
KOOR is a Slovak energy services provider with a strong track record in the country’s energy sector. This project, based in an industrial area of Poprad, is the third large-scale battery storage installation KOOR has delivered together with Wattstor since the two companies began working together in 2023.
“We began working with KOOR in 2023, and since then we’ve delivered three large-scale storage projects together in Slovakia,” said Patrik Pinkoš, Head of Sales for Europe at Wattstor. “KOOR has strong know-how and a significant footprint in the Slovak energy sector, and we’re looking forward to further projects, including some now being prepared in the Czech Republic.”
For KOOR, each new project builds on the last. Having already worked with Wattstor’s technology twice before, the team knew what to expect from the process, and used that experience to move confidently from order to deployment.
Delivering certainty on a large-scale build
Large-capacity battery projects carry real delivery risk: technical complexity, certification requirements, and tight timelines all have to come together before an asset can go live. KOOR needed a partner who could deliver a dependable system at scale. That partner also had to back it with strong local support. And it had to see the project through certification and commissioning without delay.
A battery system built to support the grid
Wattstor supplied and installed a 2MW/5MWh battery energy storage system, integrated with Podium, our energy management system (EMS). Podium runs the system automatically. Through a monitoring portal, KOOR gets round-the-clock visibility of the asset’s status. No day-to-day manual oversight is needed. The battery is designed to help support the wider electricity grid.
Looking ahead: more projects, more markets
This is the third time KOOR has trusted Wattstor to deliver a large-scale battery system, and both companies are already looking beyond Poprad. Wattstor and KOOR are currently preparing new projects together in the Czech Republic, extending a relationship that has grown with each installation. For KOOR, that means a delivery partner it already knows and trusts. For Wattstor, it’s a track record it can point to as it takes on larger and more complex battery storage projects across the region.
Ready to deliver your next large-scale battery project?
If you’re planning a large-scale battery storage project and want a delivery partner with a proven track record, get in touch with our team today.
Up next...
Transforming Energy Risk into Predictable Savings for Logistics
Contact us
If your commercial energy bills are too high but you have plenty of roof space, we could help you cut costs and carbon. Tell us more below
Contact us
If your commercial energy bills are too high but you have plenty of roof space, we could help you cut costs and carbon. Tell us more below
- +44 (0) 20 3868 5555
- [email protected]
- Wattstor Ltd, 21 Ironmonger Lane, London EC2V 8EY


