Three projects, three years – and more on the way for Wattstor and KOOR

KOOR is a Slovak energy services provider with a strong track record in the country’s energy sector. This project, based in an industrial area of Poprad, is the third large-scale battery storage installation KOOR has delivered together with Wattstor since the two companies began working together in 2023.

Project snapshot

Customer KOOR OZE, s.r.o.
Sector Energy services and project development
Location Poprad, Slovakia
Onsite system Battery energy storage system (BESS), Podium energy management system (EMS)
Battery storage 2.16 MW / 5.02 MWh
Delivery time 12 months

A partnership that keeps building

KOOR is a Slovak energy services provider with a strong track record in the country’s energy sector. This project, based in an industrial area of Poprad, is the third large-scale battery storage installation KOOR has delivered together with Wattstor since the two companies began working together in 2023.

“We began working with KOOR in 2023, and since then we’ve delivered three large-scale storage projects together in Slovakia,” said Patrik Pinkoš, Head of Sales for Europe at Wattstor. “KOOR has strong know-how and a significant footprint in the Slovak energy sector, and we’re looking forward to further projects, including some now being prepared in the Czech Republic.”

For KOOR, each new project builds on the last. Having already worked with Wattstor’s technology twice before, the team knew what to expect from the process, and used that experience to move confidently from order to deployment.

One platform, one team, delivered everywhere

The 2MW/5MWh battery energy storage system (BESS) at Poprad is a large, grid-facing asset, and getting a system this size to run reliably takes real technical depth. That’s handled by Podium, our energy management system (EMS), which manages the battery automatically and gives KOOR round-the-clock visibility of its status through a monitoring portal, with no day-to-day oversight needed on their side.

What makes this repeatable is that Podium isn’t rebuilt for each market. It’s the same platform, developed and run by the same technical team, wherever Wattstor delivers a project. That means the expertise behind a large-scale grid-support battery in Slovakia is the same expertise behind every other Wattstor deployment, regardless of country or scale.

 

A delivery model that travels well

This is the third large-scale battery system KOOR has trusted Wattstor to deliver, and the two companies are already working on new projects together in the Czech Republic. That’s not a coincidence. It reflects a delivery approach – from project design through to commissioning and ongoing support – that Wattstor applies consistently across every market it operates in, not just this one.

For KOOR, that consistency means a delivery partner they already know will perform the same way on the next project as they did on the last. For Wattstor, it’s a delivery model proven across multiple markets and multiple installations, which is exactly what makes it possible to keep taking on larger and more complex battery storage projects across the region.

Ready to make more of your onsite energy?

If you’re looking to reduce your exposure to volatile energy costs with a behind-the-meter battery storage solution, get in touch with our team today.

Contact us

If your commercial energy bills are too high but you have plenty of roof space, we could help you cut costs and carbon. Tell us more below

Contact us

If your commercial energy bills are too high but you have plenty of roof space, we could help you cut costs and carbon. Tell us more below