Helping Scottish Water Horizons beat grid constraints and get closer to net zero

End User Scottish Water Horizons
Industry Water treatment facilities
Location Selkirk, UK
Assets on site Solar PV / Wattstor BESS / Podium EMS
Solar power 1100kW
Battery (BESS) 200kW / 1,600 kWh

Find out how Scottish Water Horizons overcame grid constraints and accelerated its net zero journey with our DC-coupled BESS solution.

Scottish Water Horizons is a commercial subsidiary of Scottish Water operating as a standalone, sustainable business. It has a large focus on sustainable development, including renewable energy generation, food waste recycling, and sustainable water and wastewater infrastructure projects.

Delivering water and wastewater services makes Scottish Water the single largest user of electricity in Scotland. To offset that, the utility has ambitious decarbonisation plans, aiming to reach net zero by 2040 – five years ahead of the Scottish Government’s target. It also has an interim target of delivering an extra 90GWh of new renewable generation by 2030, the equivalent of powering over 24,000 homes for a year.

As part of the larger Scottish Water group, Scottish Water Horizons is playing a crucial role in helping the utility reach its carbon reduction goals, and has installed a variety of technologies over the last decade. These include solar PV, wind, biomass boilers and anaerobic digestion to help offset energy consumption and reduce C02 emissions. Moreover, at its site in Howden, Scottish Water Horizons has a large ground area with enormous potential for renewable energy generation.

 

The challenge: overcoming grid constraints and maximising land use

To achieve its decarbonisation objectives, Scottish Water Horizons plans to install more low-carbon energy projects at scale, including solar PV coupled with battery energy storage systems (BESS). However, grid constraints and net capacity issues in Scotland are severely holding its plans back, threatening the success of the decarbonisation programme.

In fact, its Distribution Network Operator, Scottish Power Energy Networks, limited Scottish Water Horizons’ onsite generation and export to 200kW due to restricted capacity on its networks.

With grid constraints jeopardising the success of its decarbonisation efforts, Scottish Water Horizons was looking for a viable solution to make the most of its available land and install enough renewable generation assets to produce a large percentage of the energy demand at its site in Howden, near Selkirk.

To do that, they utilised Wattstor in partnership with Emtec Energy as designer and installer, to benefit from our DC-coupled BESS solution in order to overcome grid constraints and get closer to their renewable generation targets.

Goals:

  • Overcome grid constraints (200kW)
  • Maximise land use
  • Move closer to the target of generating an extra 90GWh by 2030 – and reach carbon neutrality by 2040

Our approach: DC-coupled BESS and a powerful EMS

As a first necessary step, we created a bespoke project design to maximise available space and install as much solar capacity as possible.

Emtec installed 2,112 ground-mounted solar panels and optimisers for a total of 1.1MW.  The solar PV system was then paired with a 200kW/1.6MWh BESS

To help Scottish Water Horizons overcome grid constraints, we used Wattstor’s flagship DC-coupled BESS technology. This means the solar panels send DC electricity directly to the BESS system via optimisers, and then out to the site via a single AC inverter.

With this solution, Scottish Water Horizons could install as much solar PV as they wished direct to the battery, while still maintaining the 200kW AC grid connection.

How does DC coupling help overcome grid constraints? Find out more.

To optimise the entire energy system and make sure every component runs as efficiently as possible, we also integrated our powerful AI-based energy management system (EMS), Podium.

Podium is designed to manage an entire energy ecosystem and ensure it runs as efficiently and cost-effectively as possible, without human intervention. Using AI, Podium analyses current and future electricity market data, a site’s electricity usage, the onsite generation and storage capacity, and more. It then automatically manages all assets to minimise costs and maximise efficiency and cost savings.

Finally, to protect the surrounding site and community, the system was fitted with safety measures according to the latest industry best practices – including remote fault detection, automatic shutdown systems, and battery fire suppression.

Process:

  • Bespoke system design
  • Installation of 1.1MW of solar PV
  • Installation of a 200kW/1.6MWh DC-coupled BESS
  • Podium integration
  • Safety measures – fault detection, automatic shutdown systems, and battery fire suppression

Results: Five times more solar

Using Wattstor’s DC solution, Scottish Water Horizons was able to install five times the amount of renewable generation assets than their grid limit would allow. This has enabled Scottish Water Horizons to exponentially increase its generation capacity, which reached 1.2 megawatts – covering over 30% of the site’s power demand. Moreover, thanks to battery storage,maximise the potential usage of the energy generated onsite.

“Thanks to the inclusion of the batteries, we have been able to maximise the potential of the site to generate renewable energy,”

The project is also massively contributing to Scottish Water’s sustainability agenda by saving 169 tonnes of carbon emissions annually.

“Thanks to the inclusion of the batteries, we have been able to maximise the potential of the site to generate renewable energy,” said Alan Mearns, Scottish Water Horizons Project Manager. “The size of the land meant we could install a large number of solar panels. The batteries would then allow us to store and use more of the electricity , rather than having to export it to the grid.”

Mr Mearns also highlighted the importance of the system’s optimisation through Podium AI, thanks to its ability to automatically monitor the wholesale energy market and make smart decisions accordingly:

“As the scheme is remotely monitored, at the time of year when there’s not a lot of sunshine, it allows us to import from the grid at a lower rate to charge the batteries and then feed it back into the works during the times when it costs more, helping to reduce operational costs.”

Finally, the grid connection opens up the opportunity for future energy trading in the wholesale market, allowing SW to maximise the project’ ROI by exporting excess solar energy at the best possible time to maximise revenues.

“We’re proud of Wattstor’s involvement in this project,” commented Wattstor’s CCO Kevin Ball. “The water and wastewater industry is on a tight deadline to reduce its carbon emissions, and regulators as well as the public are closely scrutinising the sector to ensure progress is made. It’s great to be able to offer concrete solutions that help water companies overcome their sustainability challenges.”

Outcome:

  • 1.2 megawatts of renewable energy generated
  • 169 tonnes of carbon saved annually
  • +30% of the site’s power demand is met
  • 100% of the renewable energy generated is used
  • Possibility to export excess energy to the grid

Would you like some support to overcome grid constraints, meet your carbon reduction targets and slash your electricity bills? Our expert team can help! Get in touch today for a free consultation.

 

1.2 MW

renewable energy generated

169

tonnes of carbon saved annually

Ready to think outside the grid?

Get in touch