End User | DŘEVOCENTRUM ŠKF |
---|---|
Industry | Wood processing |
Location | Kostelany nad Moravou, CZ |
Assets on site | Podium EMS / Wattstor BESS / Solar PV |
Battery (BESS) | 88kW / 216kWh |
Time of delivery | 1 month |
Integrated EMS and BESS solution delivered to the leading Czech specialist in wood processing in just 18 days
Wattstor partnered with the Czech specialist in processing, drying and storing the highest quality wood to deliver a market leading energy management system (EMS) project. The founders, having also been in this energy intensive industry for over 10 years, understood the advantages of reducing their energy bill through the use of renewables. They needed an intelligent EMS and BESS to specifically manage these and maximise the value from them.
The Challenge
- Reduce high energy costs
- Avoid penalties for exceeding site capacity
- Maximise benefits reaped from solar assets
- Integrate bespoke BESS
- Design and deliver solution within 18 days.
The Wattstor Solution
The leading innovative energy technology installers in Czech Republic won the solar PV part of the contract. They then selected us as their partner for EMS and BESS because of our market leading capabilities.
Wattstor deployed a bespoke energy management system, Podium EMS, and created a tailored BESS to ensure maximum return on their solar investment.
Along with the solar panels and 236 kWh battery, some of the operational load is also managed on the closed-loop system. This flexibility also means that energy consumption, generation and storage is optimised towards the energy markets. This helps to avoid exceeding the site capacity, and takes advantage of avoiding price peaks.
The use of Wattstor’s platform also means that the end user can integrate further generation, storage, operational load or electric vehicle charging without needing to upgrade their EMS in the future.
Integrated EMS and BESS solution delivered to the leading Czech specialist in wood processing in just 18 days.
The Wattstor Mission
Our mission is to deliver fully financed onsite energy systems at a lower rate than grid electricity. We want to provide everything organisations need to generate, store and manage renewable electricity on site, making net zero a reality.
With the best EMS on the market, cost-efficient solar and BESS systems, and the ability to design and deliver bespoke renewable projects, we can pave the way for your path to net zero – removing all obstacles en route and supporting you at every stage of the process.
Contact us to find out how we can help you.
75%
reduction
in electricity bills
18
days
from design to delivery and installation
3
years
payback (with subsidy)
Want to learn more?
Learn how Wattstor works with partners to deliver best-in-class EMS solutions
Ready to think outside the grid?